TUZLA DEEP SEA DISCHARGE CONSTRUCTION WORK
Project Purpose: Increasing the maximum flow rate of Tuzla Wastewater Treatment Plant capacity to 1,000,000 m3/day required increasing the capacity of the existing discharge line. In this context, Tuzla Wastewater Treatment Marine Discharge is the work of constructing a new DN2200 line parallel to the existing DN2200 mm line.
Description of the Project: Laying a sea discharge line with Ø2200 mm, Ø1800 mm, Ø1400 mm inner diameter, a total of 2450 m, 22.3 cm concrete-coated steel pipe on the outside, a land pipeline with a total of 1005 m steel pipe with Ø2200 mm inner diameter,
Our company has completed the 1/1000 scale sensitive bathymetric map measurements of the Discharge route.